Description du poste |
Code |
180809109
|
Intitulé |
1 SCHEDULING OPTIMIZER
|
Branche d'activité |
Agro-Industrie/Agriculture |
Missions / Tâches |
• Day to day follow up of manpower, materials and assets according to planning
• Maximise OTIF
• Define and communicate raw material needs. Assure of execution
• Translate mid-term planning in daily scheduling in an optimize way (OTIF, cost, inventory level)
• Schedule assets for efficient conversion cost
• Operate tank and silo with minimal inventory
• Coordinate inflow and outflow of material through the assets
• Integrate and challenge planned and unplanned disturbances (manpower, assets, materials)
• Ensure cross functional relationships and consistency of planning across streams.
|
Salaire mensuel |
To be negociate; medical care:100%; Company pension scheme (F CFA) |
Type de contrat |
Contrat à durée indéterminée |
Nature des horaires |
Plein |
Lieu du travail |
Douala |
Date d'expiration |
24 / 08 / 2018 |
|